Labour Cost per Machine Hour: The Missed Line

Labour is 11% of a circular knitting machine-hour rate and sets operator ratios: a worked cost-per-kg model, automation payback and reversal thresholds.

On a 34-inch, 28-gauge single jersey machine running 21 kg per hour, labour costs about US$0.029 per kg at a US$3.60 loaded wage with one operator to six machines. Against a machine-hour rate of US$5.57, that is roughly 11% of the hourly cost — a line most payback models round to zero while a 5% movement in machine price gets two weeks of negotiation.

The number that moves money is not the wage but the operator ratio: how many machines one person can carry before quality drops. That choice changes labour cost per kg threefold across ratios mills actually run — and changes second-quality rate by more than the labour saving is worth.

Why the Labour Line Gets Deleted

Cost sheets are built from four defensible numbers: machine price, depreciation hours, power tariff, spare-part consumption. Labour arrives later as a plant overhead percentage, applied to everything and owned by nobody. Two quotes for the same machine then get compared on sticker, while the operating difference sits in operator ratio and fault detection.

Cost lineBasis (indicative, 2026 Q4)US$ per machine hour
DepreciationUS$120,000 over 30,000 running hours4.00
Power5.2 kW at US$0.10/kWh0.52
Needles, sinkers, sparesConsumable allowance at 21 kg/h0.45
Labour1 operator : 6 machines, US$3.60 loaded0.60
Machine-hour rateSum of the four lines5.57

At 21 kg/h that rate converts to US$0.265 per kg, of which labour is US$0.029 — the only one of the four lines a supervisor controls daily, and the only one improvable without buying anything.

Operator Ratio by Diameter and Style

Ratio claims are usually made on the easiest fabric in the catalogue. These ranges assume maintained machines with yarn-break detectors and needle stop-motion, stable yarn, and supervisors who can see the fabric.

Machine / fabricMachines per operatorWhat sets the ceiling
30 in, 24G plain single jersey, 180 gsm10–12Roll doffing weight; low fault visibility need
34 in, 28G single jersey, 150–180 gsm6–8Needle-line faults appear fast at fine gauge
34 in, 20G rib6–7Package changes on multiple feeds
38 in, 24G interlock / double jersey5–6Heavier rolls, more stops per 1,000 courses
38 in, 4-colour jacquard3–4Pattern faults are costly and slow to spot

Two corrections: without fault detection, subtract two machines from every row; with one technician shared across 40 machines, the ratio that survives the night shift runs one to two lower than the day-shift sheet.

The Formula, With On-Costs Included

Loaded wage is the only wage worth modelling. In Zhejiang and Guangdong, on-costs — social insurance, housing fund, shift premium, canteen, transport, supervision — run about 25–40% on base pay; in Vietnam roughly 15–25%. Both are indicative 2026 Q4 ranges to be replaced with payroll actuals.

Loaded wage/hour = base wage/hour × (1 + on-cost rate)
Labour per machine hour = (1 ÷ machines per operator) × loaded wage
Labour per kg = labour per machine hour ÷ kg per machine hour

Check against the first table: (1 ÷ 6) × 3.60 = US$0.60 per machine hour; 0.60 ÷ 21 = US$0.0286 per kg. Three inputs, one minute, a number a buyer can defend in a quote review.

Worked Example: 34-Inch Single Jersey at Three Wage Levels

Hold kg/h at 21 and vary the two inputs buyers argue about. Figures are labour cost per kg, US dollars.

Operator ratioUS$2.40/h loadedUS$3.60/h loadedUS$5.20/h loaded
1 : 40.02860.04290.0619
1 : 60.01900.02860.0413
1 : 90.01270.01900.0275
1 : 120.00950.01430.0206

Read the diagonal, not the rows. Doubling loaded wage from US$2.40 to US$5.20 at a fixed 1:6 adds US$0.0223 per kg — 12% of an 8% margin on US$2.30/kg fabric. Moving 1:6 to 1:9 at US$3.60 saves only US$0.0096 per kg, about US$0.20 per machine hour. Wage arbitrage between countries matters far more than supervisor efficiency; the country-level version is in the total cost of ownership comparison.

What an Automation Upgrade Has to Beat

Automatic doffing and yarn-break monitoring are quoted at roughly US$14,000–22,000 per machine installed, indicative and dependent on diameter and feed count. Take US$18,000 with the ratio moving 1:6 to 1:9, saving 0.0556 operator-hours per machine hour.

Annual saving = 0.0556 × loaded wage × annual machine hours

At US$3.60 and 6,000 hours that is US$1,201 per year, a 15-year payback on a machine with a 10-year life. For three-year payback the saving must reach US$6,000, requiring a loaded wage near US$18 per hour — four to five times current cost in most Asian mills. Automation sold on headcount rarely survives a CFO review; the same hardware sold on defect reduction often does.

Run the defect side the same way. At 21 kg/h and US$2.30/kg, one machine hour produces US$48.30 of fabric; a one-point rise in second-quality rate destroys US$0.48 — 2.4 times the US$0.20 labour saving. If a supplier cannot show fault-rate data from a mill running the proposed ratio, the labour case alone is the weaker half. Needle and sinker consumption track the same fault rate, which is why the spare parts cost calculator and maintenance cost breakdown belong in the same review.

When This Conclusion Reverses

Four conditions flip the answer from “keep the ratio, buy detection” to “widen it now”:

  • Loaded wage above US$4 per hour, when the fix is a retrofit. A US$4,000 detector and doffing-assist retrofit needs US$1,333 a year for three-year payback: 0.222 per machine hour at 6,000 hours, which the 1:6 to 1:9 move delivers at exactly US$4.00 loaded wage. Full automation at US$18,000 needs US$18/h to reach the same payback.
  • Fabric value below US$0.95 per kg. There the 1pp defect penalty (0.01 × price) falls under the US$0.0096/kg labour saving from widening the ratio, and labour becomes the larger number.
  • Fewer than 3,000 machine hours per year. Fixed headcount over low utilisation pushes labour per kg up faster than any ratio change recovers; the decision becomes shift design.
  • Single shift with a shared technician. The night-shift constraint disappears and 1:8 becomes realistic for 34-inch fine gauge without new capital.

The conclusion holds firm when yarn quality is inconsistent, when small orders force frequent changeovers, and when the buyer’s own audit samples second-quality rate — there an over-wide ratio surfaces as claims, not payroll.

Before signing, ask the supplier to disclose the labour assumption behind any productivity claim: operators per machine, loaded wage, and the kg/h it was measured at. A quote that cannot state those three numbers is not comparable. The machine price guide covers what sits inside the equipment price, the import cost calculator handles the landed side, and where a ratio change alters container mix or shipping terms the FOB, CIF and DDP comparison is the reference.

FAQ

How do I calculate labour cost per kg on a circular knitting machine?
Divide one by machines per operator to get operator-hours per machine hour, multiply by the loaded wage, then divide by kg per machine hour. At 1:6 and US$3.60 loaded, one machine hour carries US$0.60; at 21 kg/h that is US$0.0286 per kg.

What on-cost rate should I use?
Payroll actuals if available. Otherwise 25–40% on base pay for Chinese mills and 15–25% for Vietnamese mills are workable indicative 2026 ranges, covering social insurance, housing fund, shift premium, meals, transport and supervision.

How many machines can one operator run before quality drops?
For 34-inch 28-gauge single jersey, 6–8 with fault detection and 4–6 without. Wide jacquard machines sit at 3–4 because pattern faults are costly and slow to detect. Fault visibility and doffing weight set the limit, not walking speed.

Does cheap labour make automation pointless?
For headcount-only justification, largely yes: at US$3.60 loaded wage an US$18,000 doffing package needs about 15 years on labour alone. It still pays where it cuts second-quality rate by a full point or lifts speed.

Why 6,000 machine hours per year?
250 days at 24 hours, a common three-shift baseline. At 3,000 hours the same hourly labour cost doubles the per-kg burden, and ratio changes pay back twice as fast.

Should conversion cost use depreciation at new price or replacement price?
Replacement price for a go-forward purchase decision, book value for a plant P&L. Mixing the two is the usual reason two departments get different cost-per-kg figures from one machine.

Leave a Reply