On one 30-inch single jersey machine, owning beats outsourcing at roughly 46 tonnes of fabric a year — the volume where an indicative USD 0.32/kg conversion fee equals the fully loaded cost of running your own machine. Below that, the knitter who already carries the capital and the downtime is cheaper. Three inputs decide it: landed capex, machine hours a year, and the fee you are quoted.
Two Prices, Only One Is Comparable
An outsource quote is a conversion fee: knitting only, per kilogram, with the knitter’s profit, waste allowance and utilization risk already inside it. Your own cost is not machine price divided by output. It is landed capex spread over its life, plus power, labour, maintenance, floor space and tied-up capital, divided by kilograms actually sold.
Comparing a full-cost own figure against a bare CMT (cut-make-trim) quote is the usual error, and it points the wrong way. Keep both sides per kilogram of saleable fabric, at the same volume, in one currency, anchored to the 2026 Q4 exchange band. For what sits inside a machine’s lifetime cost across supply origins, the country-level TCO comparison is the better starting point.
What the Conversion Fee Contains
A conversion fee usually bundles machine time, operator time, power, needle and sinker wear, and 2–5% waste. It excludes yarn, packaging, freight both ways, sampling, and rejects beyond the liability cap. Full-package quotes blend yarn in and hide the conversion rate — ask for the split, because only that part compares to your own machine.
| Line in the quote | Inside CMT? | Watch for |
|---|---|---|
| Machine time | Yes | Priced at the knitter’s efficiency, not yours |
| Waste / yield allowance | Yes, 2–5% | Charged on yarn weight, not finished weight |
| Yarn | No, job work | Full-package quotes blend it in |
| Freight both ways | No | Rolls move twice; own machine moves once |
| Sampling, setup per design | No | Punishes short runs, not long ones |
| Rejects past the cap | No | Capped at 2–3% of order value typically |
The Break-Even Formula
Split own cost into fixed — paid whether the machine runs or not — and variable, paid per machine hour.
Break-even volume (kg/yr) = [ Landed capex ÷ Life + Maintenance + Floor & overhead ] ÷ [ Conversion fee − (Power per hour + Labour per hour) ÷ kg per machine hour ]
Worked example, single jersey, two shifts, 6,000 machine hours a year:
| Input | Assumption | Annual USD |
|---|---|---|
| Landed capex | USD 38,000 FOB + 15% freight, duty, install | 43,700 once |
| Depreciation | 7 years, straight line | 6,243 |
| Power | 10 kW average × USD 0.11/kWh × 6,000 h | 6,600 |
| Labour | USD 4.0/h loaded, 1 operator per 5 machines | 4,800 |
| Maintenance and wear | 4% of FOB per year | 1,520 |
| Floor, insurance, air | Allocated | 1,200 |
| Total | 15 kg/h × 6,000 h = 90,000 kg | 20,363 = USD 0.226/kg |
Fixed block = 6,243 + 1,520 + 1,200 = USD 8,963. Variable = 6,600 + 4,800 = USD 11,400, or USD 0.127/kg. At a USD 0.32/kg fee: 8,963 ÷ (0.32 − 0.127) = 46,400 kg a year, about 3,100 machine hours. Against other quotes:
| Fee quoted | Break-even | Verdict at 90 t capacity |
|---|---|---|
| USD 0.28/kg | 58,500 kg | Buy only with a full order book |
| USD 0.32/kg | 46,400 kg | Buy above half capacity |
| USD 0.36/kg | 38,400 kg | Buy above one third of capacity |
| USD 0.40/kg | 32,800 kg | Buy early; payback under four years |
Own Machine vs Outsource: Six Rows
| Dimension | Own machine | Outsource |
|---|---|---|
| Cost per kg at 40 t/yr | USD 0.35 (fixed block spread thin) | USD 0.32 |
| Cost per kg at 90 t/yr | USD 0.226 | USD 0.32 |
| Cash before first roll | USD 35,000–55,000 landed | Zero capex, yarn stock only |
| Response to design change | Hours to days, if the machine fits | Their queue, not yours |
| Quality feedback | Immediate, first metres | After the run, at the cap |
| Idle-capacity risk | Yours; fixed block bills monthly | Knitter’s, priced into the fee |
| Exit cost | Resale at 40–60% after three years | None; stop ordering |
Thresholds That Decide It
Four gates, in order. First, volume above the break-even in the table above. Second, sustained volume: one 60-tonne order that never repeats is 60 t once, while the fixed block keeps billing. Third, order count: below about 20,000 kg per design, sampling and setup charges stay small, and your own changeover hours are free only if the machine is idle anyway. Fourth, lead-time tolerance — if the customer accepts four to six weeks, the queue is not a disadvantage and the case for capex weakens.
Then check capacity. One 30-inch machine at 15 kg/h and 6,000 hours gives 90 tonnes; the machine’s diameter and gauge set that ceiling, which is the substance of the single jersey versus double jersey choice. Beyond 90 tonnes you need a second machine, which doubles the fixed block and pushes break-even to about 93 tonnes. Past that point the question is no longer buy-or-outsource but how many, and the marginal machine only has to cover its own variable cost.
When This Conclusion Reverses
The fee collapses. At USD 0.20/kg the break-even rises to about 122,000 kg — beyond one machine’s capacity, so it never pays. Regional overcapacity produces exactly this. It is also temporary; do not put a seven-year depreciation against a two-year price.
The machine is not plain jersey. A jacquard version at 2.5× the FOB raises the fixed block to roughly USD 20,600 and pushes break-even past 106,000 kg. Two shifts and a full order book are prerequisites before the flexibility is worth anything. Rib and interlock sit in between, as the interlock versus rib cost comparison shows.
You run one shift. Fixed cost does not halve with hours; capacity does. At 3,000 hours the machine makes 45,000 kg against a 46,400 kg break-even — below water, which is why single-shift mills outsource the peak instead of buying for it. This leans entirely on the 15 kg/h assumption, so verify it against the actual gauge, diameter and yarn.
Duty, wage or power moves. An 8% import duty adds about USD 3,040 to capex and USD 430 a year to the fixed block. Wages at USD 6.5/h instead of 4.0 add USD 0.021/kg. Power at 0.18/kWh instead of 0.11 adds USD 0.047/kg. Each is survivable; together they erase a 30% advantage.
Rejects are the quiet reversal. The figures assume 96–98% first-pass yield. At 92% you sell fewer kilograms for the same fixed block, and cost per saleable kg rises about 4–5%. Outsource contracts cap the knitter at 2–3% of order value, so the risks are asymmetric — yours is uncapped. Wear parts, the largest maintenance line, are priced in the OEM versus aftermarket parts comparison.
FAQ
At what annual volume does buying beat outsourcing?
At an indicative USD 0.32/kg fee and a USD 38,000 FOB machine, about 46 tonnes a year — roughly half of one machine’s two-shift capacity. Recalculate with your own quote, landed capex and power price.
Should the price I compare include yarn?
No. Compare conversion fee to conversion cost. Yarn is common to both routes, but a full-package quote hides the conversion rate in a blended number.
Does the break-even change on one shift?
Break-even volume does not move, but capacity halves and falls below it. That is why single-shift mills outsource peaks rather than buy for them.
Which costs do buyers forget?
Floor space, insurance, compressed air, capital tied up in the machine, extra yarn stock, and maintenance that arrives in years three to seven rather than evenly.
Is a used machine a shortcut?
It lowers the fixed block but raises maintenance and yield risk. At 55% of new capex, break-even falls to roughly 30 tonnes — attractive only if inspection covers cylinder, cam box and drive.
What if my order mix is many small designs?
Outsource. Setup charges scale with design count, but so do your changeover hours, and the queue absorbs them. A flat machine changes the arithmetic again by making short runs viable in-house.