Your freight is quoted per container, not per machine, so on orders of six units or more the loading plan moves your landed cost further than the ocean rate you negotiate. A 40HQ from China to Northern Europe costs roughly USD 2,000–3,800 (indicative, Q4 2026). Load seven 34-inch machines into that box instead of six and the freight line per machine drops about 17% without a point off the rate.
The Rate Is Per Container, So the Loading Plan Sets Unit Cost
Forwarders price a 40HQ or 20GP as a slot on a vessel; they do not price how much iron goes inside it. That leaves three levers: units per box, dismantling depth, and whether spare parts ride in the same container instead of paying their own minimum charge.
Most buyers argue about the rate and ignore the divisor. At a typical USD 2,600 ocean freight plus USD 700 of origin charges and dunnage on a 40HQ to Europe, six machines carry USD 550 each and seven carry USD 471. Only the divisor changed.
A 20GP is not a cheaper version of the same plan. It costs roughly 60–75% of a 40HQ but holds about 40% of the volume, so it wins only on small consignments — two to four 30-inch units or spare parts.
What One Machine Occupies After Dismantling
Brochure dimensions describe a machine standing on a floor. What loads is a machine split into cylinder head, frame, creel and control cabinet, with take-down and fans crated. Ask for a crate-level packing list with cubic volume and gross weight before you accept any freight quote.
| Machine class | Dismantled footprint (m) | CBM per unit | Gross weight (kg) | Units per 40HQ | Units per 20GP |
|---|---|---|---|---|---|
| 30″ single jersey | 2.4 × 1.5 × 1.6 | 5.8 | 2,600–3,000 | 9 | 4 |
| 34″ single jersey / fleece | 2.7 × 1.7 × 1.7 | 7.8 | 3,000–3,400 | 7 | 2 |
| 38″ rib / interlock | 3.0 × 1.9 × 1.8 | 10.3 | 3,500–4,000 | 5 | 2 |
| 42″ double jersey | 3.4 × 2.1 × 1.9 | 13.6 | 4,200–4,800 | 4 | 1 |
Treat these as typical ranges, not a specification. A 38-inch machine with a high feeder count and a separately crated creel can gain 15–20% in volume.
The Two Limits: Cubic Capacity and Payload
Every container has two ceilings and you hit the lower one. A 40HQ has about 76 CBM internal and 26,000–28,000 kg payload, of which roughly 66 CBM survives lashing and access space; a 20GP gives 26 usable CBM and about 21,000 kg.
Units per container = MIN( ⌊usable CBM ÷ (CBM per unit × (1 + lashing allowance))⌋ , ⌊max payload ÷ gross weight per unit⌋ ), with an allowance of 10–15%.
Worked example: six 34-inch machines at 7.8 CBM and 3,200 kg, one 40HQ, 12% allowance. Volume limit: 66 ÷ (7.8 × 1.12) = 7.55, so 7 units. Payload limit: 26,000 ÷ 3,200 = 8.1, so 8. The plan is 7 machines, bound by volume, leaving 4.8 CBM and about 3,600 kg — enough for a spare parts crate that would otherwise pay its own LCL minimum.
Freight per machine = (ocean freight + origin charges and documents + lashing and dunnage) ÷ units loaded. With USD 2,600 + 320 + 420 = 3,340 ÷ 7 = USD 477 per machine. Loaded as six, the same consignment costs USD 557 each. That USD 80 gap is the whole negotiation.
Which ceiling binds decides what you specify. At 30 inches volume binds, so a lighter frame buys nothing and more feeders can cost a slot. From 38 inches up payload binds, and a heavier frame can drop you from four units to three. Check our import cost calculator before fixing quantity per container.
Loading Documents: What Must Be Signed Before the Doors Close
| Document | Issued by | Needed by | What fails without it |
|---|---|---|---|
| Crate-level packing list (CBM, net and gross) | Supplier | Before booking | Freight quote and loading plan are guesswork |
| Certificate of origin (Form E or equivalent) | Issuing authority in China | Before departure | Preferential duty cannot be claimed on arrival |
| ISPM 15 mark or fumigation certificate | Licensed treatment provider | Before export | Wooden crates refused or re-treated on arrival |
| Bill of lading, original or telex release | Carrier | At arrival | Container is not released to your broker |
| Marine insurance certificate | Insurer | Before sailing | Transit damage claim is rejected |
| Lashing record with photographs | Packer, witnessed by your inspector | Before doors close | Carrier liability dispute becomes unwinnable |
The lashing record is the one buyers skip. Without dated photographs of every lashing point and the dunnage layout, a carrier will blame inadequate securing and you carry the loss. If nobody on your side can attend the loading, attach the photo set to the exit inspection you already commission — one visit covers both, as in this supplier audit framework and third-party audit scope guide.
Who Carries the Load at Each Step
| Stage | FOB | CIF | DDP |
|---|---|---|---|
| Loading, lashing, dunnage at origin | Seller | Seller | Seller |
| Loss or damage at sea | Buyer | Buyer once loaded on board | Seller |
| Clearance, duty and VAT | Buyer | Buyer | Seller |
| Inland haulage and unloading at your floor | Buyer | Buyer | Seller if written in the contract |
| Demurrage from late documents | Buyer | Buyer, unless seller’s document | Seller |
CIF misleads most: the seller pays freight and arranges insurance, but risk passes when the goods are on board in China — the party who paid for shipping is not the party who owns the loss. If finance wants one invoice, CIF is convenient; if you want control of claims, FOB with your own forwarder is cleaner. The landed-cost stack behind each term sits in this duty and shipping cost guide.
DDP needs one warning: unloading is not automatically included. Sellers quote to the terminal gate and leave the crane to you. Write “delivered to floor, unloading by seller’s rigging crew, cost included” into the contract or the term saves nothing.
When This Plan Reverses
Density logic stops paying in five situations:
- Above 42 inches payload binds. If four machines is both the volume and the weight limit, a fifth is impossible and per-machine freight stops falling. Negotiate the container rate, not the unit price.
- Very small consignments favour LCL. Two 30-inch machines are about 11.6 CBM plus allowance; at USD 50–150 per CBM, LCL often beats a whole 20GP once fixed charges land.
- Large-diameter units can leave the container. A 42-inch machine with a tall creel may exceed usable door height; flat rack, open top or break-bulk can beat forced dismantling and re-erection.
- Your site may not be able to unload. A 4,500 kg machine needs real crane capacity, and a 40HQ floor sits about 1.2 m above ground. Rigging cost can exceed the freight saved by one more unit.
- Free time decides the last mile. If clearance and trucking cannot finish inside the carrier’s free days — typically 3–7 — demurrage at USD 80–200 per day erases the density gain. On a first shipment, plan buffer days.
One reversal is commercial: nine machines in one box concentrates risk, and a lost container takes your production plan with it. Splitting eight across two 20GP boxes costs more freight and buys redundancy. Above about USD 150,000 cargo value per container, price that trade.
Frequently Asked Questions
How many circular knitting machines fit in a 40HQ container?
Four to nine depending on diameter — about nine 30-inch, seven 34-inch, five 38-inch, four 42-inch. Volume limits small diameters, payload limits units above 34 inches; compute both and take the lower.
Is it cheaper to ship one machine in a 20GP or by LCL?
LCL usually wins below roughly 15 CBM total, since a 20GP carries fixed charges whether full or half empty. Above that the container is cheaper per unit, with controlled lashing.
Does the machine have to be dismantled?
Yes for standard diameters: cylinder head, creel and control cabinet are separated and the frame is skidded. Confirm dismantling, crating and re-erection drawings sit in the machine price — re-assembly is a separate one to three technician days.
Who pays demurrage if my broker is late?
Under FOB and CIF the buyer, since clearance is the buyer’s obligation. Where the delay comes from a seller-side document such as a missing certificate of origin, assign that cost in the contract.
Should the packing list show net or gross weight?
Both. Valuation works from the invoice, but lashing plans, axle limits and payload calculations need gross weight per crate. Net weight only is a common reason quoted freight later changes.
Which Incoterm avoids unloading surprises?
None, unless the contract says so. FOB with your own forwarder gives the clearest control; DDP works only when unloading at your floor is the seller’s written obligation.
