A 40-foot high cube held nine days past free time adds USD 900–1,600 to a USD 26,000 FOB machine — 3.5–6% of its value — and the carrier bills the consignee, not whoever caused the delay. Both clocks are cheaper to remove before the vessel sails.
Two Clocks, and What Each Costs
Demurrage is charged while the container sits inside the terminal, after the free days following discharge expire. Detention is charged while it is outside the terminal and not yet returned empty. Separate tariffs on separate clocks — one negotiated figure for “port charges” always leaves money on one side.
The start date matters more than the rate. Demurrage begins at discharge, not at vessel arrival or the arrival-notice date: a late Friday discharge consumes two of five free days before a broker opens the file on Monday. Detention begins at gate-out under merchant haulage, or at discharge under carrier haulage. Customs delays land on demurrage, foundation and crane delays on detention — so fix the clock your own process controls.
| Charge | Indicative per 40HQ-day | Clock starts | Invoiced by |
|---|---|---|---|
| Demurrage, tier one (days 1–5 chargeable) | USD 90–150 | Day after free time expires from discharge | Carrier or terminal |
| Demurrage, tier two (day 6 onward) | USD 150–260 | Same clock, escalating band | Carrier or terminal |
| Detention, empty return overdue | USD 60–130 | Day after free time expires from gate-out | Carrier or container owner |
| Terminal storage after the demurrage cap | USD 25–60 per cbm-week | When the box is moved off-dock | Terminal or depot |
| Crane and crew standby on site | USD 250–500 | When a booked slot is missed | Rigging contractor |
| Prime mover or chassis standby | USD 120–300 | Per re-booked haulage slot | Haulage company |
Rates are indicative for Q4 2026 in USD; tariffs escalate by tier and vary by port, so use the page printed at booking. Freight is a separate line, in this import duty and shipping cost guide. The tier jump is the trap — day six costs about twice day one — and past day four a bonded warehouse is usually cheaper than the clock.
The Formula That Turns Free Time into a Budget
Price the delay the way you price the machine, before the deposit leaves:
Delay cost = (Ddem × Rdem) + (Ddet × Rdet) + (Cstandby × Dstandby) + Lfin
Ddem is chargeable demurrage days at tiered rate Rdem; Ddet detention days at Rdet; Cstandby idle crane and crew per day; Lfin financing cost of money already paid for an idle machine.
Worked example: one 40HQ, FOB USD 26,000, free time 5 days demurrage and 7 detention. Discharge 3 November, release 10 November after origin verification, empty returned 19 November because the foundation is not ready.
- Demurrage = 10 − 3 − 5 = 2 days × USD 120 = USD 240
- Detention = 19 − 10 − 7 = 2 days × USD 85 = USD 170
- Standby, two re-booked crane slots × USD 350 = USD 700
- Total = USD 1,110, or 4.3% of FOB
Stress the base case: three more terminal days push demurrage into tier two at USD 200, turning USD 240 into USD 600. That sensitivity is what you hold in reserve — the same arithmetic that governs freight timing in this sea freight guide for textile machinery.
Who Pays Under FOB, CFR and DDP
The Incoterm decides who contracts the carriage, not who absorbs delay. The carrier bills the party on the bill of lading, which recharges under the contract; where the two disagree, the carrier wins.
| Term | Freight booked by | Destination demurrage | Destination detention | Deciding clause |
|---|---|---|---|---|
| FOB | Buyer | Buyer, as consignee | Buyer | Consignee named on the bill of lading |
| CFR / CIF | Seller | Buyer, unless liner terms all-in | Buyer | Freight prepaid excludes delay charges |
| DAP | Seller | Seller | Buyer beyond the unloading window | Unloading free time, usually 4–6 hours |
| DDP | Seller | Seller | Seller, unless return is assigned to buyer in writing | Named place plus written return duty |
Under FOB and CFR you own both clocks, so negotiate free time with the carrier at booking, not the supplier. Under DAP and DDP the seller owns them and recovers the cost inside the machine price — the arithmetic this import cost calculator walkthrough is built to expose. Origin files matter as much: a missing certificate becomes terminal days, not a smaller invoice, as the Vietnam duty structure and VAT reduction checklist both show.
Documents That Decide Who Pays
In a dispute the carrier asks for evidence, not explanation. Keep this file per shipment; complete documents cut release time by one to three days.
| Document | Held by | Delay it prevents | Value in a waiver request |
|---|---|---|---|
| Timestamped arrival notice | Carrier agent | Late customs lodgement | Proves when notification reached you |
| Bill of lading, original or telex | Bank or shipper | No delivery order without it | Shows whom the carrier may bill |
| Delivery order and interchange receipt | Buyer or haulier | Gate-out and damage disputes | Fixes the gate-out date |
| Entry, invoice, packing list, origin certificate | Broker | Held entry, inspection referral | Shows the delay was authority-driven |
| Tariff page and booking confirmation | Buyer | Wrong-tier or inflated billing | Only proof of your agreed free days |
| Crane and rigging booking confirmation | Buyer | Standby charges on both sides | Shows mitigation was already booked |
Three Levers That Remove Most of the Exposure
Lodge the entry before arrival, one person-day. With manifest, invoice, packing list and origin certificate five days before ETA, most brokers pre-clear and release on the discharge date — one to three chargeable days saved.
Negotiate free time at booking, one week once. Ask for 14 days demurrage and 14 days detention on capital equipment; carriers grant it selectively at USD 100–250 per container, still cheaper than four tier-two days. Keep the tariff page — free days exist only if you can produce them.
Sequence trucking after unloading, one person-day. Book the crane for the day after a confirmed gate-out with a 48-hour re-book clause, and return the empty the day the machine leaves the trailer. Detention is nearly always self-inflicted; the loading and return plan belongs in the pre-shipment evidence file, as in this supplier audit checklist for China.
When This Conclusion Reverses
Paying to remove the risk is not always rational:
- Exposure under one day. One tier-one day at USD 90–150 is cheaper than the USD 300-plus carriers charge to extend free time on a two-container booking.
- Output value exceeds the rate. If a commissioned machine earns USD 1,200 a day in contribution, USD 120 to protect the schedule is correct. Demurrage is only expensive against idle capacity.
- The delay is structural. Where port dwell averages over ten days, free-time negotiation stops working; change gateway or take carrier haulage with an all-in window.
- Small freight, critical parts. For a crate of needles, air freight can beat sea freight plus storage — but the deciding number is line-down cost, not the invoice.
Currency flips the model too. Figures are USD at a Q4 2026 band of CNY 7.10–7.25 per USD; a swing beyond 3% moves standby and rigging lines more than demurrage, so re-run at your settlement rate before signing DDP.
FAQ: Demurrage, Detention and Delay Cost
What is the difference between demurrage and detention?
Demurrage runs while the container is inside the terminal beyond free time; detention runs while it is outside and not yet returned empty. Separate tariffs, separate clocks — budget and negotiate them independently.
When does the demurrage clock start?
At discharge, not at arrival or the notice date. A late or weekend discharge eats free days before any customs file exists, which is why pre-lodging the entry is the strongest control.
Who pays under FOB terms?
The buyer, as consignee on the bill of lading. Under CFR and CIF destination delay stays with the buyer unless the contract grants liner terms all-in; under DAP and DDP the seller carries it and prices it back in.
How much free time should I request?
14 days demurrage and 14 days detention on 40HQ capital equipment, against a market default of five to seven. Expect USD 100–250 per container if granted, and keep the written grant.
Can demurrage be waived?
Sometimes, with evidence that the carrier, terminal or customs authority caused the delay: arrival notice, entry lodgement, inspection referral, interchange receipt. Treat goodwill waivers as a bonus, never a plan.
Does DDP remove demurrage risk?
Not automatically. The seller bears delivery to the named place, but the empty-return duty can sit with whoever holds the container. Assign the return obligation in the contract, not only in the Incoterm.